Country road Landeck – Fliess (AT)
120 piles Ø 900 mm
Sundgraben Bridge Beatenberg (CH)
18 piles Ø 1000 mm
Double-track extension of the Trübbach – Buchs SG railroad (CH)
10 piles Ø 1300 mm
Slope stabilization before and after hairpin bend (CH)
44 piles Ø 750 mm
Bad Zurzach eastern bypass (CH)
34 piles Ø 880 mm | 1011 piles Ø 1000 mm | 192 piles Ø 1300 mm
Tunnel les Avants
40 piles Ø 100 cm
secondary AND primary pile reinforced
City center “Bären” Ostermundigen
21 piles Ø 700 mm I 53 piles Ø 1200 mm
Tunnel des Gîtes (CH)
172 piles Ø 1000 mm
Full connection Raron A9
2,240 piles Ø 1300 mm | 294 piles Ø 1000 mm | 170 piles Ø 880 mm | 140 piles Ø 750 mm
Private boathouse on Lake Lucerne
50 piles reinforced Ø 600 mm I 50 piles unreinforced Ø 600 mm
Rösslimatt; neighborhood for education, living, work & leisure (CH)
135 piles Ø 500 mm I 77 piles Ø 1200 mm I 39 piles Ø 1500 mm
West-east link road, Schattdorf (CH)
4 piles Ø 1500 mm
Wilderswil bypass (CH)
664 piles Ø 900 mm
Joint power plant Inn (CH/AT)
90 piles Ø 1200 mm
Second Gotthard road tunnel (CH)
117 piles Ø 1300 mm
Roche Tower (CH)
43 piles Ø 1200 mm | 104 piles 1500 mm
HS2 high-speed line (UK)
29 piles Ø 1200 mm I 178 piles Ø 1500 mm I 24 piles Ø 1800 mm