Important connecting road Landeck – Fliess (AT)

Pile breaking for the connecting road in Landeck

L76 important connecting road Landeck – Fliess (AT)

International use of Brextor® in Austria at Berger + Brunner
Engineer Roland Kainbacher appreciated the fast processing time per pile. Before Brextor® , the pile breaking was made by hand – this was very time-consuming and the time pressure was high. They then found out about Brextor® on the Internet and, thanks to the good conditions (good concrete quality), the pile breaking was even faster than specified / with the same quality.
Processing time 5 days incl. Arrival and departure.