Foreign deployment with Brextor® in Austria at Berger + Brunner
Ing. Roland Kainbacher appreciated the fast processing time per pile. Before Brextor®, the piles were processed by hand – this was very time-consuming and the time pressure was high. They then found out about Brextor® on the Internet and thanks to the good conditions (good concrete quality), the piles were capped even faster than specified / with the same quality.
Processing time 5 days incl. Arrival and departure.