Country road Landeck – Fliess (AT)

Pile breaking on the Landeck highway

Foreign deployment with Brextor® in Austria at Berger + Brunner
Ing. Roland Kainbacher appreciated the fast processing time per pile. Before Brextor®, the piles were processed by hand – this was very time-consuming and the time pressure was high. They then found out about Brextor® on the Internet and thanks to the good conditions (good concrete quality), the piles were capped even faster than specified / with the same quality.
Processing time 5 days incl. Arrival and departure.

Contact us

Fill in the contact form and benefit!

You have questions or want to know more about our products? Simply fill out the contact form and we will get back to you as soon as possible. Take this opportunity to benefit from our exclusive method!