Slope stabilization before and after hairpin bend (CH)

Project: Satteleggstrasse / supporting structure Chratzerli Vorderthal. Brextor® in action in Vorderthal – Swiss mountain panorama included!


In a geologically challenging area, the Satteleggstrasse was secured in the long term by slope stabilisation measures before and after a hairpin bend. The slope on the mountain side was secured by a max. 5.20 m high, pre-concreted retaining wall on 15 concrete bored piles, which were tied back with 15 permanent anchors. On the valley side, the road was stabilised by a back-anchored concrete beam on 29 concrete piles, with 22 permanent anchors being used.