Shinkansen high-speed line (JP)

Cropping of piles in Japan! The first piles have been processed with Brextor®!

This in the impressive project “Pillars of Shinkansen Elevated Bridge” a remarkable project that contributes to the expansion of the Hokkaido Shinkansen in Tomakomai, Hokkaido.

The piers of the Shinkansen elevated bridge consist of a series of concrete pillars supporting an elevated bridge for the Hokkaido Shinkansen, Japan’s high-speed rail network. Located in Tomakomai, Hokkaido, the bridge spans the Tomakomai River and is a central part of the planned extension from Shin-Hakodate-Hokuto to Sapporo, which is scheduled for completion in 2030.

Number of piles: 60

Pile diameter: 1500mm

Dismantling height: 1800 mm

Kontaktieren Sie uns

Kontaktformular ausfüllen und profitieren!

Sie haben Fragen oder möchten mehr über unsere Produkte erfahren? Füllen Sie einfach das Kontaktformular aus und wir melden uns schnellstmöglich bei Ihnen. Nutzen Sie diese Chance, um von unserer exklusiven Methode zu profitieren!