Sundgraben Bridge Beatenberg (CH)

Cutting piles for bridge piers

We also take off for special operations – short deployment with Brextor® on the Sundgraben Bridge in Beatenberg.
After 2 days of work, the construction site was released again for the next work steps.

This construction project comprises an elegant, 148 m long concrete bridge with bored piles 1 meter in diameter. The bridge has a central span of 65 m and leads to an approximately 144 m long road section in the west, accompanied by a slope support structure. The total correction length is around 325 meters, with a carriageway width of 7.50 m on the bridge and 7.0 m in the road cut. A 2.5 m wide footpath on the valley side allows bicycles to be used on the uphill side. The bridge also accommodates a municipal water pipe and new BKW and Swisscom service lines. The bored piles were cropped with Brextor®.

Kontaktieren Sie uns

Kontaktformular ausfüllen und profitieren!

Sie haben Fragen oder möchten mehr über unsere Produkte erfahren? Füllen Sie einfach das Kontaktformular aus und wir melden uns schnellstmöglich bei Ihnen. Nutzen Sie diese Chance, um von unserer exklusiven Methode zu profitieren!